This paper is published in Volume-4, Issue-2, 2018
Area
Mechanical Engineering
Author
Shailendra Vishwakarma, Surjeet Singh Baghel
Org/Univ
Bansal Institute of Science and Technology, Kokta, Madhya Pradesh, India
Pub. Date
25 April, 2018
Paper ID
V4I2-1845
Publisher
Keywords
Line balancing (LB), Non-value-added activities (NVA), Assembly line balancing (ALB).

Citationsacebook

IEEE
Shailendra Vishwakarma, Surjeet Singh Baghel. Balancing of the production line in a manufacturing industry to improve productivity, International Journal of Advance Research, Ideas and Innovations in Technology, www.IJARIIT.com.

APA
Shailendra Vishwakarma, Surjeet Singh Baghel (2018). Balancing of the production line in a manufacturing industry to improve productivity. International Journal of Advance Research, Ideas and Innovations in Technology, 4(2) www.IJARIIT.com.

MLA
Shailendra Vishwakarma, Surjeet Singh Baghel. "Balancing of the production line in a manufacturing industry to improve productivity." International Journal of Advance Research, Ideas and Innovations in Technology 4.2 (2018). www.IJARIIT.com.

Abstract

This work mainly focuses on the application of line balancing to minimize idle time of workstation in the production line. The methodology adopted includes calculation of cycle time of the process, identifying the non –value-added activities, calculation of total workload on station and distribution of workload on each workstation by line balancing, in order to improve the efficiency of line. A production line of a bearing retainer component manufactured by Porwal Auto Components Pvt Ltd, Pithampur, Dhar (M.P) is considered for this research work and time study is performed in order to determine the standard time for each process. Then, rank positional weighted method (RPW) is evaluated with the help of standardized data to solve the assembly line problem and defines the line efficiency which provides a better productivity in the existing flow line by reducing the idle time.