This paper is published in Volume-6, Issue-2, 2020
Area
Construction Management
Author
Manish Darekar, Dr. Navnath V. Khadake
Org/Univ
Imperial College of Engineering and Research, Pune, Maharashtra, India
Pub. Date
20 April, 2020
Paper ID
V6I2-1426
Publisher
Keywords
MS-Project, Planning, Scheduling, Allocation of resource

Citationsacebook

IEEE
Manish Darekar, Dr. Navnath V. Khadake. Planning, scheduling and allocation of resource for cost optimization of multi-storeyed structure, International Journal of Advance Research, Ideas and Innovations in Technology, www.IJARIIT.com.

APA
Manish Darekar, Dr. Navnath V. Khadake (2020). Planning, scheduling and allocation of resource for cost optimization of multi-storeyed structure. International Journal of Advance Research, Ideas and Innovations in Technology, 6(2) www.IJARIIT.com.

MLA
Manish Darekar, Dr. Navnath V. Khadake. "Planning, scheduling and allocation of resource for cost optimization of multi-storeyed structure." International Journal of Advance Research, Ideas and Innovations in Technology 6.2 (2020). www.IJARIIT.com.

Abstract

In every construction project, there are two most important factors to be considered in the planning of project i.e. time and cost. Time deals with speed, quality of work and availability of tools and materials whereas cost deals with optimization and availability of resource. The aim of this project is to complete the project within a given time and a budget, and also to achieve the other objectives. The constraints that are observed in every project is time overrun and cost overrun. As we can say it’s a most difficult task for a project managers to practice it, which includes fixed measuring progress, executions as per plan and corrective actions should be taken whenever required. Due to proper planning and scheduling, it gives us a knowledge of proper time and the process of cost mostly remains the same. Basically, cost optimization and allocation of resource directly deals with availability of tools and materials. With a proper sequence of activities with assigned durations and resource, scheduled is prepared. In this project critical path and critical activities are studied with the use of MS-Project 2016, so that activities should be properly observed while execution, so that there will be no delay of time in the project, and also, stay focused on the wastage of materials thus lead to the proper optimization of materials and reduction of cost.